Sarkari Jobs · Results · Admit Cards

Join Telegram

Home › Schemes & Subsidies › Ministry of Steel, Government of India

Production Linked Incentive (PLI) Scheme 1.2 for Specialty Steel

The PLI Scheme 1.2 provides financial incentives to companies registered in India for the incremental production and sales of notified specialty steel products. It aims to boost domestic manufacturing, encourage investment in advanced technology, and support employment generation.

Join Telegram

Production Linked Incentive (PLI) Scheme 1.2 for Specialty Steel

Ministry of Steel, Government of India Schemes & Subsidies : Short Details

Sarkari Data

Important Dates

  • Base Year : Financial Year 2024–25
  • Incentive Period : Five years commencing from FY 2025–26

Application Fee

Check the official notice

Benefit / subsidy

Incentive on incremental sales of manufactured specialty steel products.

Eligibility

Companies registered under the Companies Act, 2013, engaged in end-to-end domestic manufacturing of identified specialty steel grades.

Net Worth Requirement

Minimum 30% of total committed investment based on audited financial statements of the preceding financial year.

Exclusions

Companies classified as NPA, wilful defaulters, fraud, or those with insolvency proceedings admitted before NCLT.

Required documents

Certificate of Incorporation, CIN details, audited financial statements, net worth certificate, Board Resolution, Detailed Project Report (DPR), end-user certificate, and product sub-category details.

Application process

Online registration via the official PLI portal using CIN; submission must be made by an authorized signatory.

Responsible authority

Ministry of Steel, Project Management Agency (PMA), and Empowered Committee.

Application availability

Current opening status is unconfirmed; applications must be submitted within 30 days of the scheme launch.

Details & How To Apply

The scheme supports domestic value addition where input material is melted and poured within India. Up to 20% of total value addition may be outsourced to third parties. Incentives are claimed only by the company manufacturing the eligible end product. Limiting investment is capped at 80% of the committed investment at the time of claim. Financial Year 2024–25 serves as the baseline for performance calculations. Capacity enhancement can be achieved through new units or augmentation of existing units. Companies cannot claim incentives for the same investment/sales under other PLI schemes. Projects receiving incentives under previous rounds of the Specialty Steel PLI are ineligible. Only one registration per Corporate Identification Number (CIN) is permitted. Incremental production is calculated based on sales compared to the corresponding previous period. The scheme requires a Detailed Project Report (DPR) for application. Applicants must not have insolvency proceedings admitted before the NCLT. The scheme is designed to develop advanced steel manufacturing capabilities. Incentives are provided for a maximum duration of five years. The scheme is centrally sponsored and managed by the Ministry of Steel.

SOME USEFUL IMPORTANT LINKS

Official Scheme DetailsClick Here

Always verify dates, eligibility and fees on the official website before applying. Sarkari Data is not affiliated with any government body.

Frequently Asked Questions

What is the objective of the PLI Scheme 1.2?

To promote domestic manufacturing of specialty steel through incentives on incremental production and investment.

Who can apply under this scheme?

Companies registered in India under the Companies Act, 2013 manufacturing eligible specialty steel products.

What is the minimum net worth requirement?

The net worth of the applicant company, including group companies, must not be less than 30% of the total committed investment.

What is the eligibility for Production Linked Incentive (PLI) Scheme 1.2 for Specialty Steel?

Companies registered under the Companies Act, 2013, engaged in end-to-end domestic manufacturing of identified specialty steel grades.

Where can I find the official notice for Production Linked Incentive (PLI) Scheme 1.2 for Specialty Steel?

Use the official links listed on this page. Verify dates and eligibility on the recruiting authority’s official website before applying.

More Schemes & Subsidies · All Ministry of Steel, Government of India posts